The study for the MUZOOS building in Rýdeč, which was prepared by the company 3+1 architekti from Ústí nad Labem, was completed on 28. February 2024 . In the History of the project section, you can follow the steps that preceded its development.


To view the Study, click 
HERE.

During March 2024, the Study was gradually reviewed within the MUZOOS group (Karlíček, Krsek, Kůstka, Petr, Plánička) and by the AOPK ČR, Regional Office of the Czech Central Highlands Protected Landscape Area Administration. Subsequently, architect Plánička was asked to modify the external appearance of the main building based on the comments. Key modifications include: roofing made of baked "beaver" tiles, window divisions in the shape of a cross, and replacing the cordon cornice on the east and south sides with a different shade and plaster finish. The result can be seen in the following drawings (note: the window cross division is not refined in the axonometric views).

Nastavení soukromí a cookies

Webové stránky používají k poskytování služeb, personalizaci reklam a analýze návštěvnosti soubory cookies.

Následující volbou souhlasíte s našimi zásady ochrany osobních údajů a cookies. Svá nastavení můžete kdykoli změnit.